Construction engineering of the standard industry unit in Guanzhou Island(phase II)
Release time:2015-06-12
The general area of construction is 81009.79m2,mainly includes production workshop, pilot factory, office building andproduction premise. The engineering issues contain civil work of foundationditch, basement and over-ground parts as well as curtain wall engineering,steel structure engineering, mechanical equipmentinstallation engineering, roofing system engineering, outdoor accessoryengineering(road, drainage, park construction, scenery lighting, greening andplanting), fitment and decoration engineering, etc.
Open completion time: 2011.3.26 - 2014.5 Construction cost: 21808 Million yuan Awards:Be awarded safe and civilized construction site sample by Guangdong Province in 2012;AA standardized safe and civilized building site in Guangdong in 2012;