General contract for the community renewal in Dongjiao District A (phase I)
Release time:2015-06-12
It is a residence with a general construction area of 63070m2. There are threebuildings in total, coding A1, A2, A3. There are 28 floors over ground, addingup to 46143.20m2and 3 floors underground, and adding up to 16656.80m2. The engineering issues include foundation put support engineering, buildingdecoration engineering, protection engineering work and some mechanicalequipment installation engineering like ventilation installation and water drainage.
Open completion time: since 2011.9.11 Construction cost: 20719 Million yuan Awards:Under construction;High-Quality Structure awarded by Guangzhou in 2014;Be awarded safe and civilized construction site sample by Guangdong Province in 2013