Current position > Projects > Building project
Tianlu Southern Compound construction engineering(phase I, bid-section 3)
Release time:2015-06-12
The general construction area is about 88000m2. Theconstruction range includes the 16-18 floors of 9 buildings(#18-#20、#25-#30), rubbish dealing room and one floor ofbasement. We contract the decoration project of the basement and the upperparts of the building, electric and mechanical equipment installation (includingelectrical system, water supply and drainage system, fire fighting watersystem, fire-control auto-alarm system, ventilation system, light currentsystem, lightening protection system, elevator engineering, etc.) and otheraccessory projects. Open completion time: since2012.3 Construction cost: 25616 Million yuan Awards:standardized safe and civilized building site in Guangdong ;standardized safe and civilized building site in Guangdong in 2013