Systematic reconstruction of Daguan Road and Chebei Road and grade-separation civic work of the Olympic Center(2-bid section)
Release time:2015-06-12
The total length of the road is 400m and the length of the viaduct is 345m(with a span of 42m). The tunnel is about 36605m. It is an asphalt pavingproject. Open completion time: 2009.3.1 - 2010.12.10 Construction cost: 5766 Million yuan Awards:Win the gold cup of National Municipal Works in 2011;Municipal sample works of Guangdong Province in2011;Municipal sample works of Guangdong Province in2011;double priority site of Guangdong Province in2010